  • 加气混凝土设备的生产步骤讲解
  • 本站编辑:杭州和恒建筑有限公司发布日期:2019-06-21 22:11 浏览次数:

1、加气混凝土砌体原料库和材料

1. Air-entrained concrete masonry material storehouse and materials

原料输送到汽车工厂、粉煤灰(或砂,石材使用,料斗装运。 袋装水泥或散装水泥仓库。 当用于加载到料斗。 在化工、化学物质、铝分别使用分别装运生产车间。

Raw materials are transported to automobile factories, fly ash (or sand, stone, hopper shipment). Bagged cement or bulk cement warehouse. When used to load into hopper. In the chemical industry, chemical substances, aluminium are used separately in the shipment workshop.

2、加气混凝土砌体材料处理

2. Treatment of Aerated Concrete Masonry Material

粉煤灰(或砂和水泥)电磁振动给料机、皮带输送机、地面球进灰与粉煤灰(或砂和水泥)泵被送到存储。 石灰通过电磁振动给料机、皮带输送机分为颚

Fly ash (or sand and cement) electromagnetic vibration feeder, belt conveyor, ground ball ash and fly ash (or sand and cement) pump are sent to storage. Lime is divided into jaws by electromagnetic vibration feeder and belt conveyor.

破碎机,通过桶石灰分解成石灰后,然后存储、滚珠螺杆输送机磨成细螺旋输送机,斗成粉末配料。 化学物质在一定比例,这是由人工测量

Crusher, through the barrel of lime decomposition into lime, and then storage, ball screw conveyor grinding into a fine screw conveyor, bucket into powder ingredients. Chemicals in a certain proportion are measured manually.

一定的浓度,存储解决方案。 铝铝库生产车间,电动葫芦倒

Certain concentration, storage solution. Aluminum and Aluminum Warehouse Production Workshop, Electric Hoist Pour

成分建立搅拌机搅拌成水,定量球形悬浮

Composition Establishment Mixer Mixing into Water, Quantitative Spherical Suspension

1527328865391568.jpg

3、加气块配料、搅拌、浇注

3. Ingredients, mixing and pouring of aeration block

石灰、水泥粉配料螺旋输送机的自动计量,积累规模下螺旋输送机将加入浇注材料均匀搅拌。

The automatic metering of screw conveyor for lime and cement powder proportioning, under the accumulated scale, screw conveyor will add pouring material to mix evenly.

粉煤灰(或砂和水泥砂浆)和浪费在量筒测量,测量后在各种材料已经到位的模具情况,可以混合浆,浆前铸造应该实现过程需求(40°c),等

Fly ash (or sand and cement mortar) and waste in measuring barrel are measured. After measurement, the molds with various materials in place can be mixed with slurry. Pre-slurry casting should meet the process requirements (40-deg; c), etc.

温度不够,可以通过蒸汽加热在浆计量柜,在浇注0.5 1分钟前加入铝悬挂。

If the temperature is not enough, the slurry metering cabinet can be heated by steam. Aluminum suspension can be added 0.51 minutes before pouring.

4、加气块的早期和削减

4. Early and Reduction of Gas Filling Block

铸造模具与链后早期提高室温,气体初始头发50 - 70°c,开始提高1.5 - 2个小时的时间(根据地理优势,可以使用这种技术在提高早期),负传播者将框架和身体共同前进好斧头放在框架的底部的切断。 铸造机。 纵向切割工具、车削、铣削、框架挂头面包对石油的运输模式、清洁和人工和为下一辆公车集团模具铸造模具,加上身体后两层上使用起重机在地板上水壶,水壶今后四层,几个水壶一辆汽车。 当削减浪费的铸造机,螺旋输送机的废纸浆混合循环废水机,用于原料。

Casting mold and chain early increase room temperature, gas initial hair 50 - 70 & deg; c, start to increase the time of 1.5 - 2 hours (according to geographical advantages, you can use this technology to improve early), negative propagator will advance the frame and body together, good axe cut at the bottom of the frame. Casting machine. Longitudinal cutting tools, turning, milling, frame hanging bread for oil transportation mode, cleaning and artificial and casting mould for the next bus group mould, plus the use of crane on the floor of the latter two layers of the body kettle, the next four layers of kettle, several kettles and a car. When reducing waste of foundry machine, screw conveyor waste pulp mixing recycling wastewater machine, used for raw materials.

5、高压加气块的高压和成品

5. High Pressure and Products of High Pressure Gas Block

在大锅在这个身体之前,完成后组织打开水壶热压处理过的锅锅,反应堆内的门拉吊起,然后完成水壶高压釜将准备水壶汽车起重机为维护高压水壶。 取消生产的起重机挑选,然后用来完成加载车辆段,空的汽车和斧地板水壶挂回输入网络,把后院与起重架在接下来的周期。

Before the big pot is in this body, after completion, the organization opens the hot-pressed pot of the kettle, the door inside the reactor is pulled and lifted, and then the kettle automobile crane will be prepared to maintain the high-pressure kettle after completion of the kettle autoclave. Cancel the selection of cranes, and then use to complete the loading depot, empty cars and axe floor kettles hang back into the input network, the backyard and crane in the next cycle.


手机:15888805222